UMA Installs Tieback Anchors at USMC Bombing Range

Imagine installing tieback anchors to repair a bulkhead with U.S. military aircraft conducting live-fire training nearby. That’s exactly what we…

Supporting Manufacturer’s Cable Tower with Design-Build and Terra-Crete

One of the challenges during retrofit construction is that consideration to future expansions are not typically planned for during the…

Wall 4 on the Greensboro Western Loop

UMA Geotechnical Construction constructed all of the eight required permanent soil nail walls along a roughly two-mile stretch of the…